Our service/repair and installation teams are fully experienced and trained gate installation engineers, they are fully employed by AGD Systems.Installation Stages
There are generally two or three stages to an installation (please be prepared for a pause between stages): -
- 1st Fix – Ground works/post fixing/cable ducting/motor boxes
- 2nd Fix – Hanging of Gates and Operators/Safety Devices
- 3rd Fix – Access Controls, commission and hand over
Before commencing work the installation team will carry out a Risk Assessment of the site entrance, as a result they may bring to your attention any items deemed to be hazardous, we may request your assistance to resolve any issues relating to safety.
Please let us know in advance if there are specific dates or times when access is required, otherwise we advise that during the installation driveway accessibility may be limited for a period of time - up to 48 hours in cases where a sliding gate concrete foundation has been laid.
Once your system has been checked and commissioned the Installation Team should show you how to operate the system and which safety devices have been employed – please try to be available when they plan to complete so that the relevant documentation can be handed over.
If you are unavailable for Handover please contact us so that we can forward any documentation including End User Guide(s).
(click here, to download the generic End User Guide)
Site Preparation Plan
If the ground works and power supply requirements are being carried by a third party, we can supply a site preparation plan and on site liaison upon request.